Description
Used for charging of Accumulators with gas as well as pressure checking and adjustment. When charging, the nitrogen bottles must be capable of delivering pressure higher than the desired accumulator gas pressure. Construction Standard version comprises Valve body complete with ring nut connection to accumulator gas valve, pressure gauge, bleed and non return snap-in connection.
High pressure hose complete with connections. Two pressure gauges (HP&LP) Set of spare gaskets. Carrying case.
Adaptor to connect to nitrogen bottle
The HYDAC charging and testing unit FPU is used to charge accumulators with nitrogen or to check or to change the existing pre-charge pressure in accumulators. For this purpose the charging and testing unit is screwed onto the gas valve of the hydraulic accumulator and connected via a flexible charging hose to a commercial nitrogen bottle. If the nitrogen pressure is only to be checked or reduced, the charging hose does not need to be connected. The unit has a screw-type fitting with a built-in pressure gauge, check valve and a spindle for opening the accumulator gas valve to check the pressure.
The HYDAC charging and testing unit FPU is used to charge accumulators with nitrogen or to check or to change the existing pre-charge pressure in accumulators. For this purpose the charging and testing unit is screwed onto the gas valve of the hydraulic accumulator and connected via a flexible charging hose to a commercial nitrogen bottle. If the nitrogen pressure is only to be checked or reduced, the charging hose does not need to be connected. The unit has a screw-type fitting with a built-in pressure gauge, check valve and a spindle for opening the accumulator gas valve to check the pressure.
The HYDAC charging and testing unit FPU is used to charge accumulators with nitrogen or to check or to change the existing pre-charge pressure in accumulators. For this purpose the charging and testing unit is screwed onto the gas valve of the hydraulic accumulator and connected via a flexible charging hose to a commercial nitrogen bottle. If the nitrogen pressure is only to be checked or reduced, the charging hose does not need to be connected. The unit has a screw-type fitting with a built-in pressure gauge, check valve and a spindle for opening the accumulator gas valve to check the pressure.
Charging sets are used to inflate, check, top-up or vent the nitrogen gas precharge in all accumulators. They are to be screwed to the gas valve or bladder stem and connected to the gas regulator that fits the Nitrogen bottles. They are supplied in a plastic case.
Universal charging set fits most of the hydraulic accumulators available on the market. Maximum working pressure: limited by the maximum operating pressure of the installed pressure limited to 400 bar in any case
Charging sets are used to inflate, check, top-up or vent the nitrogen gas precharge in all accumulators. They are to be screwed to the gas valve or bladder stem and connected to the gas regulator that fits the Nitrogen bottles. They are supplied in a plastic case.
Universal charging set fits most of the hydraulic accumulators available on the market. Maximum working pressure: limited by the maximum operating pressure of the installed pressure limited to 400 bar in any case
Charging sets are used to inflate, check, top-up or vent the nitrogen gas precharge in all accumulators. They are to be screwed to the gas valve or bladder stem and connected to the gas regulator that fits the Nitrogen bottles. They are supplied in a plastic case.
Universal charging set fits most of the hydraulic accumulators available on the market. Maximum working pressure: limited by the maximum operating pressure of the installed pressure limited to 400 bar in any case. The universal charging kit allows the charging of a wide variety of accumulators. Adaptors supplied in the kit suit US or European style gas valves as well as the OFC standard ranges.
The charging kit includes a bull nose adaptor for connecting directly to high pressure nitrogen cylinders. However, please note that OLAER rec-ommend the use of a nitrogen regulator (readily available from your gas supplier) to prevent damage to the bladder during charging.
The permanently mounted gauging/charging head allows precharge pressure monitoring (when the accumulator is isolated from ssystem pressure & bled). The UCK is still required for initial precharg-ing as well as precharge maintenance.